This work presents the synthesis of a master's degree dissertation about the design coordination. The case studies in two real estate development companies and in three building design offices made it possible to characterize the practices adopted for the design coordination, according to the alternatives used for its accomplishment. It were identified four alternatives, the design coordination accomplished interns or externally to the technical staff of the companies, the outsourced design coordination, besides the consultancy in coordination. In the academic middle the term consultancy was used to refer to the service of outsourced. The study of the companies allowed to distinguish the work of those two modalities of design coordination. In the coordination activities, the focus is on the coordination management, related to the planning and to the management of design process, and on the technical coordination, regarding the integration and the design development, all of them being promoted through the coordination meetings, the compatibilization and the critical analysis. Keywords: engineering design; building design; design coordination.

Downloads

Download data is not yet available.

Author Biographies

  • Maria Vitória Marim Ferraz Pinto da SILVA
    Engenheira Civil, Mestra pelo Programa de Pós-graduação em Construção Civil da Universidade Federal de São Carlos.
  • Celso Carlos NOVAES, UFSCar
    Engenheiro Civil, Doutor em Engenharia de Construção Civil e Urbana pela Escola Politécnica da Universidade de São Paulo, professor-orientador no Programa de Pós-Graduação em Construção Civil da UFSCar.

Published

2008-06-05

Issue

Section

Papers

How to Cite

SILVA, Maria Vitória Marim Ferraz Pinto da; NOVAES, Celso Carlos. THE COORDINATION OF BUILDING DESIGNS: CASES. Gestão & Tecnologia de Projetos (Design Management and Technology), São Carlos, v. 3, n. 1, p. 44–78, 2008. DOI: 10.4237/gtp.v3i1.28. Disponível em: https://revistas.usp.br/gestaodeprojetos/article/view/50927.. Acesso em: 22 jul. 2024.